HWY RAMP C over I 195

AT E END OF BRAGA BR · County 005, Massachusetts · Built 2016 · 1 Lanes · 9,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F02110BMBDOTNBI
Year Built
2016
Length
200.2 m (656.8 ft)
Max Span
54.9 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
9,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,253,000
Total Project Cost
$1,880,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.