HWY S MAIN ST over I 195
AT I 195 · County 005, Massachusetts · Built 1964 · 4 Lanes · 14,353 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.70135, -71.1553
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 62 years old.
Nearby Bridges
HWY THIRD ST over I 195
Built 1964
HWY MILLIKEN BLV over COMB I 195 & RAMPS
Built 1961
HWY FOURTH ST over I 195
Built 1964
HWY RAMP C over I 195
Built 2016
HWY RAMP E over HWY POCASSET ST
Built 2016
HWY RAMP C over HWY POCASSET ST
Built 2016
HWY RAMP A over HWY POCASSET ST
Built 2016
HWY RAMP G over COMB CENTRAL ST & MACRR
Built 2016
HWY CENTRAL ST over WATER QUEQUECHAN RIVER
Built 1903
HWY CENTRAL ST over RR MACRR
Built 1904
Bridge Details
- Structure #
- F020633V5DOTNBI
- Year Built
- 1964
- Length
- 41.2 m (135.2 ft)
- Max Span
- 21.3 m
- Width
- 55.8 m (183.1 ft)
- Lanes
- 4
- Daily Traffic
- 14,353
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,215,000
- Total Project Cost
- $22,823,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.