HWY THIRD ST over I 195

AT CITY HALL · County 005, Massachusetts · Built 1964 · 2 Lanes · 4,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
F020643XHDOTNBI
Year Built
1964
Length
41.3 m (135.5 ft)
Max Span
20.1 m
Width
24.4 m (80.1 ft)
Lanes
2
Daily Traffic
4,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,654,000
Total Project Cost
$9,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.