I 195 over COMB ST79 & TAUNTON RIV
FALL RIVER/SOMERSET LINE · County 005, Massachusetts · Built 1965 · 6 Lanes · 81,260 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.703597, -71.16025
This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 61 years old.
Nearby Bridges
HWY RAMP G over COMB CENTRAL ST & MACRR
Built 2016
HWY CENTRAL ST over RR MACRR
Built 1904
HWY ST138 W FREX over COMB MACRR/QUECHAN RIVE
Built 1905
HWY CENTRAL ST over WATER QUEQUECHAN RIVER
Built 1903
HWY ANAWAN ST over RR MACRR
Built 1904
HWY RAMP C over I 195
Built 2016
HWY RAMP A over HWY POCASSET ST
Built 2016
HWY RAMP C over HWY POCASSET ST
Built 2016
HWY RAMP E over HWY POCASSET ST
Built 2016
HWY WATER ST CON over RR MACRR
Built 2015
Bridge Details
- Structure #
- F020583TKDOTNBI
- Year Built
- 1965
- Reconstructed
- 2016
- Length
- 1761.7 m (5779.9 ft)
- Max Span
- 256 m
- Width
- 30.9 m (101.4 ft)
- Lanes
- 6
- Daily Traffic
- 81,260
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $353,463,000
- Total Project Cost
- $530,195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.