I 195 over COMB ST79 & TAUNTON RIV

FALL RIVER/SOMERSET LINE · County 005, Massachusetts · Built 1965 · 6 Lanes · 81,260 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F020583TKDOTNBI
Year Built
1965
Reconstructed
2016
Length
1761.7 m (5779.9 ft)
Max Span
256 m
Width
30.9 m (101.4 ft)
Lanes
6
Daily Traffic
81,260
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$353,463,000
Total Project Cost
$530,195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.