HWY JORDAN RD over ST 3 NB/PILGRIM HWY

4.5 M S OF RTE 44 · County 023, Massachusetts · Built 1955 · 2 Lanes · 2,070 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P130354B5DOTNBI
Year Built
1955
Length
16.5 m (54.1 ft)
Max Span
15.5 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
2,070
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,164,000
Total Project Cost
$3,247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.