HWY PLIMTH PLNTN over WATER EEL RIVER

1.5 M E OF RTE 3 · County 023, Massachusetts · Built 1951 · 2 Lanes · 25,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
P130254CKDOTNBI
Year Built
1951
Length
26.5 m (86.9 ft)
Max Span
8.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
25,600
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,507,000
Total Project Cost
$3,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.