HWY RIVER ST over WATER EEL RIVER
.2 MI W OF RTE 3A · County 023, Massachusetts · Built 2004 · 2 Lanes · 1,357 vehicles/day
Overall
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.936861, -70.619139
This bridge is in worse condition than 10.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
HWY PLIMTH PLNTN over WATER EEL RIVER
Built 1951
HWY PLIMTH PLNTN over HWY CLIFFORD RD
Built 1951
ST 3 A/SB WARREN over HWY PLIMOTH PLNTN HWY
Built 1950
HWY RIVER ST over HWY PLIMOTH PLNTN HWY
Built 1951
ST 3 A/WARREN AVE over WATER EEL RIVER
Built 1958
HWY SANDWICH RD over HWY PLIMOTH PLNTN HWY
Built 1950
ST 3 NB/PLGRM HWY over WATER EEL RIVER
Built 1955
ST 3 NB/PLGRM HWY over HWY PLIMOTH PLNTN HWY
Built 1956
ST 3 SB/PLGRM HWY over WATER EEL RIVER
Built 1955
HWY JORDAN RD over ST 3 NB/PILGRIM HWY
Built 1955
Bridge Details
- Structure #
- P13012AU0MUNNBI
- Year Built
- 2004
- Length
- 9.7 m (31.8 ft)
- Max Span
- 9.7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,357
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $951,000
- Total Project Cost
- $1,427,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.