HWY RIVER ST over HWY PLIMOTH PLNTN HWY

1.13 KM W OF RTE 3A · County 023, Massachusetts · Built 1951 · 2 Lanes · 5,200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
P130314B4DOTNBI
Year Built
1951
Length
55.5 m (182.1 ft)
Max Span
21.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
5,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,427,000
Total Project Cost
$14,141,000