HWY PLIMTH PLNTN over HWY CLIFFORD RD

1.4 M S OF RTE 3 · County 023, Massachusetts · Built 1951 · 2 Lanes · 23,922 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P130324CJDOTNBI
Year Built
1951
Length
13.5 m (44.3 ft)
Max Span
12.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
23,922
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$262,000
Total Project Cost
$394,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.