ST 3 NB/PLGRM HWY over HWY PLIMOTH PLNTN HWY
.8 MI SO OF LONG POND RD · County 023, Massachusetts · Built 1956 · 2 Lanes · 20,865 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.932217, -70.641956
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
HWY SANDWICH RD over HWY PLIMOTH PLNTN HWY
Built 1950
ST 3 PILGRIM HWY over HWY LONG POND RD
Built 1950
HWY RIVER ST over HWY PLIMOTH PLNTN HWY
Built 1951
ST 3 A/WARREN AVE over WATER EEL RIVER
Built 1958
HWY RIVER ST over WATER EEL RIVER
Built 2004
HWY PLIMTH PLNTN over WATER EEL RIVER
Built 1951
ST 3 SB/PLGRM HWY over WATER EEL RIVER
Built 1955
ST 3 NB/PLGRM HWY over WATER EEL RIVER
Built 1955
HWY PLIMTH PLNTN over HWY CLIFFORD RD
Built 1951
HWY JORDAN RD over ST 3 SB/PILGRIM HWY
Built 1955
Bridge Details
- Structure #
- P13033497DOTNBI
- Year Built
- 1956
- Reconstructed
- 1978
- Length
- 35.7 m (117.1 ft)
- Max Span
- 32.6 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 20,865
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,992,000
- Total Project Cost
- $4,489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.