ST 3 A/SB WARREN over HWY PLIMOTH PLNTN HWY

3.5 M S OF RTE 44 · County 023, Massachusetts · Built 1950 · 1 Lanes · 9,051 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P1302946YDOTNBI
Year Built
1950
Length
52.4 m (171.9 ft)
Max Span
24.1 m
Width
11.3 m (37.1 ft)
Lanes
1
Daily Traffic
9,051
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,889,000
Total Project Cost
$5,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.