HWY CLD SPRNG RD over WATER MINER BROOK

W OF RT8 NR SNDSFD&TOLLND · County 003, Massachusetts · Built 1938 · 2 Lanes · 129 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
O0501706YMUNNBI
Year Built
1938
Length
7 m (23 ft)
Max Span
6.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
129
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$380,000
Total Project Cost
$571,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.