HWY HMRTWN MNTVL over WATER CLAM RIVER

1.6 MI NORTH OF ROUTE 57 · County 003, Massachusetts · Built 2002 · 2 Lanes · 129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S03009AQ0MUNNBI
Year Built
2002
Length
9.4 m (30.8 ft)
Max Span
9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
129
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,737,000
Total Project Cost
$2,606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.