ST 57 SANDISFLD RD over WATER FRUITCAKE BROOK

AT JCT OF HAMMERTWN RD · County 003, Massachusetts · Built 1956 · 2 Lanes · 1,034 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S03018029MUNNBI
Year Built
1956
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,034
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$772,000
Total Project Cost
$1,159,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.