HWY ALAN RD over WATER FARMINGTON RIVER

AT ROUTE 8 INTERSECTION · County 003, Massachusetts · Built 1950 · 1 Lanes · 129 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S0303607QDOTNBI
Year Built
1950
Reconstructed
2012
Length
19.3 m (63.3 ft)
Max Span
17.9 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
129
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,737,000
Total Project Cost
$4,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.