HWY TOLLAND RD over WATER OTIS RES SPILWAY

.1 MI SOUTH OF KIBBE RD · County 003, Massachusetts · Built 2011 · 2 Lanes · 129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
O05014BD6DEMNBI
Year Built
2011
Length
13.5 m (44.3 ft)
Max Span
12.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
129
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$1,069,000
Total Project Cost
$1,604,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.