ST 23 BLANFORD RD over WATER W BR FARMINGTON R

.2 MI EAST OF ROUTE 8 · County 003, Massachusetts · Built 1934 · 2 Lanes · 2,328 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
O050060CBDOTNBI
Year Built
1934
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
2,328
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$670,000
Total Project Cost
$1,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.