HWY GIBBS RD over WATER DIMMOCK BROOK

.7 MI NORTH OF RTE 23 · County 003, Massachusetts · Built 2008 · 2 Lanes · 129 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
O05026BA8MUNNBI
Year Built
2008
Length
6.1 m (20 ft)
Max Span
6.1 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
129
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$569,000
Total Project Cost
$854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.