I 95 SB over WATER NEPONSET RIVER
N. OF NEPONSET ST/95 · County 021, Massachusetts · Built 1963 · 3 Lanes · 62,271 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.175889, -71.167011
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 63 years old.
Nearby Bridges
I 95 NB over WATER NEPONSET RIVER
Built 1963
HWY NEPONSET ST over I 95 SB
Built 1963
HWY NEPONSET ST over I 95 NB
Built 1963
HWY NEPONSET ST over WATER NEPONSET RIVER
Built 1963
I 95 SB over WATER NEPONSET RIVER
Built 1963
I 95 NB over WATER NEPONSET RIVER
Built 1963
HWY CHAPMAN ST over RR AMTRAK/MBTA
Built 1986
I 95 NB over RR AMTRAK/MBTA
Built 1964
HWY SPAULDING ST over RR AMTRAK/MBTA
Built 1888
I 95 SB over RR AMTRAK/MBTA
Built 1964
Bridge Details
- Structure #
- N250313R4DOTNBI
- Year Built
- 1963
- Length
- 39 m (128 ft)
- Max Span
- 19.2 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 3
- Daily Traffic
- 62,271
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,441,000
- Total Project Cost
- $6,662,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.