I 95 SB over WATER NEPONSET RIVER

N. OF NEPONSET ST/95 · County 021, Massachusetts · Built 1963 · 3 Lanes · 62,271 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
N250313R4DOTNBI
Year Built
1963
Length
39 m (128 ft)
Max Span
19.2 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
62,271
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,441,000
Total Project Cost
$6,662,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.