I 95 SB over RR AMTRAK/MBTA

.32 KM SW OF DEDHAM ST · County 021, Massachusetts · Built 1964 · 3 Lanes · 98,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
C0203335DDOTNBI
Year Built
1964
Length
24.4 m (80.1 ft)
Max Span
23.8 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
98,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,776,000
Total Project Cost
$4,165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.