I 95 NB over WATER NEPONSET RIVER
N. OF NEPONSET ST/95 · County 021, Massachusetts · Built 1963 · 3 Lanes · 56,887 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.175431, -71.166731
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 63 years old.
Nearby Bridges
I 95 SB over WATER NEPONSET RIVER
Built 1963
HWY NEPONSET ST over I 95 SB
Built 1963
HWY NEPONSET ST over I 95 NB
Built 1963
HWY NEPONSET ST over WATER NEPONSET RIVER
Built 1963
I 95 NB over WATER NEPONSET RIVER
Built 1963
I 95 SB over WATER NEPONSET RIVER
Built 1963
HWY CHAPMAN ST over RR AMTRAK/MBTA
Built 1986
HWY SPAULDING ST over RR AMTRAK/MBTA
Built 1888
I 95 NB over RR AMTRAK/MBTA
Built 1964
I 95 SB over RR AMTRAK/MBTA
Built 1964
Bridge Details
- Structure #
- N250313R3DOTNBI
- Year Built
- 1963
- Length
- 39 m (128 ft)
- Max Span
- 19.2 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 3
- Daily Traffic
- 56,887
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,597,000
- Total Project Cost
- $6,896,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.