I 95 SB over WATER NEPONSET RIVER

.32 KM SW OF NEPONSET ST · County 021, Massachusetts · Built 1963 · 3 Lanes · 49,655 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C0203135LDOTNBI
Year Built
1963
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
49,655
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,496,000
Total Project Cost
$2,245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.