HWY CHAPMAN ST over RR AMTRAK/MBTA

.32 KM.NE OF NEPONSET ST · County 021, Massachusetts · Built 1986 · 2 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C02009370DOT634
Year Built
1986
Length
37.5 m (123 ft)
Max Span
35.2 m
Width
17.6 m (57.7 ft)
Lanes
2
Daily Traffic
15,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$711,000
Total Project Cost
$1,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.