HWY REVERE CT over WATER E BR NEPONSET RIV

2.4 KM SE OF RTE. 95 · County 021, Massachusetts · Built 1910 · 1 Lanes · 905 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
C0204233VMUNNBI
Year Built
1910
Length
11.3 m (37.1 ft)
Max Span
10.4 m
Width
4.8 m (15.7 ft)
Lanes
1
Daily Traffic
905
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,254,000
Total Project Cost
$3,382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.