HWY WASHNGTON ST over WATER E BR NEPONSET RIV

.16 KM S OF REVERE ST. · County 021, Massachusetts · Built 1949 · 2 Lanes · 21,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C0201533GMUNNBI
Year Built
1949
Length
10.4 m (34.1 ft)
Max Span
8.8 m
Width
21.3 m (69.9 ft)
Lanes
2
Daily Traffic
21,500
Material
Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,522,000
Total Project Cost
$2,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.