HWY SPAULDING ST over RR AMTRAK/MBTA

.16 KM.E OF CHAPMAN ST · County 021, Massachusetts · Built 1888 · 2 Lanes · 7,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C0200636YDOT634
Year Built
1888
Reconstructed
2001
Length
21.8 m (71.5 ft)
Max Span
20.6 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
7,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,376,000
Total Project Cost
$8,065,000