I 95 NB over WATER NEPONSET RIVER

.32 KM SW OF NEPONSET ST · County 021, Massachusetts · Built 1963 · 4 Lanes · 47,844 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
C0203135BDOTNBI
Year Built
1963
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
47,844
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,226,000
Total Project Cost
$4,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.