HWY CANTON ST over RR CSX SPUR QBL 2.18
R 128 IND PRK LEAD MP QBL · County 021, Massachusetts · Built 1966 · 2 Lanes · 15,517 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.199333, -71.158864
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 60 years old.
Nearby Bridges
HWY DEDHAM ST over WATER NEPONSET RIVER
Built 2000
HWY DEDHAM ST over RR AMTRAK/MBTA
Built 1937
HWY DEDHAM ST over I 95
Built 2024
I 95 SB over RR AMTRAK/MBTA
Built 1964
I 95 NB over RR AMTRAK/MBTA
Built 1964
HWY GREENLDGE ST over I 95
Built 1965
HWY GREENLDGE ST over WATER NEPONSET RIVER
Built 1931
I 95 SB/ST128 SB over RR AMTRAK/MBTA
Built 2008
I 95 SB/US1/ST128 over WATER NEPONSET RIVER
Built 2008
I 95 NB/ST128 NB over RR AMTRAK/MBTA
Built 2008
Bridge Details
- Structure #
- N2503240MDOT634
- Year Built
- 1966
- Length
- 22.9 m (75.1 ft)
- Max Span
- 21.3 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 2
- Daily Traffic
- 15,517
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,283,000
- Total Project Cost
- $1,925,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.