I 95 NB/ST128 NB over RR AMTRAK/MBTA

AT RR STATION · County 021, Massachusetts · Built 2008 · 4 Lanes · 205,138 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
D050478FVDOTNBI
Year Built
2008
Length
71.8 m (235.6 ft)
Max Span
19.8 m
Width
25.8 m (84.6 ft)
Lanes
4
Daily Traffic
205,138
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,206,000
Total Project Cost
$1,810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.