I 95 SB/ST128 SB over RR AMTRAK/MBTA

AT RR STATION · County 021, Massachusetts · Built 2008 · 5 Lanes · 169,809 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D050478FUDOTNBI
Year Built
2008
Length
71.8 m (235.6 ft)
Max Span
19.8 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
169,809
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,234,000
Total Project Cost
$1,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.