HWY GREENLDGE ST over WATER NEPONSET RIVER
.32 KM.NW OF I 95 · County 021, Massachusetts · Built 1931 · 2 Lanes · 800 vehicles/day
Overall
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.209208, -71.145889
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 95 years old.
Nearby Bridges
I 95 SB/US1/ST128 over WATER NEPONSET RIVER
Built 2008
I 95 NB/US1/ST128 over WATER NEPONSET RIVER
Built 2008
I 95 SB/ST128 SB over RR AMTRAK/MBTA
Built 2008
I 95 NB/ST128 NB over RR AMTRAK/MBTA
Built 2008
I 95 /ST128 over HWY UNIVERSITY AVE
Built 2008
I 95 SB over I 95 /US1/ST128
Built 1966
I 95 NB over I 95 /US1/ST128
Built 1966
HWY GREENLDGE ST over I 95
Built 1965
HWY CANTON ST over RR CSX SPUR QBL 2.18
Built 1966
HWY DEDHAM ST over WATER NEPONSET RIVER
Built 2000
Bridge Details
- Structure #
- C0200136JDOTNBI
- Year Built
- 1931
- Length
- 17.7 m (58.1 ft)
- Max Span
- 17.7 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,788,000
- Total Project Cost
- $2,683,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.