I 95 NB over I 95 /US1/ST128
I 95 AT ST 128 · County 021, Massachusetts · Built 1966 · 2 Lanes · 27,543 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
42.207581, -71.14
This bridge is in worse condition than 93.9% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 60 years old.
Nearby Bridges
I 95 SB over I 95 /US1/ST128
Built 1966
HWY GREENLDGE ST over I 95
Built 1965
I 95 SB/US1/ST128 over WATER NEPONSET RIVER
Built 2008
I 95 NB/US1/ST128 over WATER NEPONSET RIVER
Built 2008
HWY GREENLDGE ST over WATER NEPONSET RIVER
Built 1931
I 95 SB/ST128 SB over RR AMTRAK/MBTA
Built 2008
I 95 NB/ST128 NB over RR AMTRAK/MBTA
Built 2008
I 95 /ST128 over HWY UNIVERSITY AVE
Built 2008
HWY DEDHAM ST over WATER NEPONSET RIVER
Built 2000
HWY DEDHAM ST over RR AMTRAK/MBTA
Built 1937
Bridge Details
- Structure #
- C0203635HDOTNBI
- Year Built
- 1966
- Length
- 81.7 m (268 ft)
- Max Span
- 23.5 m
- Width
- 29.8 m (97.8 ft)
- Lanes
- 2
- Daily Traffic
- 27,543
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $15,864,000
- Total Project Cost
- $23,797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.