I 95 NB/US1/ST128 over WATER NEPONSET RIVER

I 95AT SOUTH END OF ST128 · County 021, Massachusetts · Built 2008 · 5 Lanes · 82,621 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
C020268FWDOTNBI
Year Built
2008
Length
42.1 m (138.1 ft)
Max Span
39.9 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
82,621
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$737,000
Total Project Cost
$1,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.