ST 2 W MAIN ST over RR PARR

.25MI W OF ROUTE 8 422.77 · County 003, Massachusetts · Built 1882 · 2 Lanes · 27,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
N140320DPDOT634
Year Built
1882
Reconstructed
1930
Length
39.6 m (129.9 ft)
Max Span
37.8 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
27,000
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,155,000
Total Project Cost
$6,233,000