HWY MAIN ST over WATER HOOSIC RIVER

0.1 MI S OF ST 2 · County 003, Massachusetts · Built 1959 · 2 Lanes · 729 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
N140110ECDOTNBI
Year Built
1959
Length
16.1 m (52.8 ft)
Max Span
14.8 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
729
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$365,000
Total Project Cost
$548,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.