ST 8 STATE ST over COMB HOOSIC RIV & PARR

SOUTH OF RTE 2 RR422.49 · County 003, Massachusetts · Built 1941 · 2 Lanes · 22,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N140180DNDOT634
Year Built
1941
Reconstructed
2012
Length
248.5 m (815.3 ft)
Max Span
48.8 m
Width
18.4 m (60.4 ft)
Lanes
2
Daily Traffic
22,200
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,656,000
Total Project Cost
$6,985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.