ST 2 /ST8/UNION over WATER N BR HOOSIC RIVER

AT CLIFF STREET · County 003, Massachusetts · Built 1958 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
N140130AFDOTNBI
Year Built
1958
Reconstructed
1983
Length
25 m (82 ft)
Max Span
21.6 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
8,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,431,000
Total Project Cost
$3,647,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.