ST 2 /ST8/UNION over WATER N BR HOOSIC RIVER
AT CANAL STREET · County 003, Massachusetts · Built 1956 · 2 Lanes · 5,571 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.7004, -73.106653
This bridge is in worse condition than 11.8% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
HWY EAGLE ST over WATER N BR HOOSIC RIVER
Built 1957
ST 2 /ST8/UNION over WATER N BR HOOSIC RIVER
Built 1958
HWY HOLDEN ST over WATER N BR HOOSIC RIVER
Built 1976
HWY MARSHALL ST over WATER N BR HOOSIC RIVER
Built 1956
ST 2 VTRNS MEM DR over COMB ST8 & HOOSIC RIV
Built 1959
HWY MAIN ST over WATER HOOSIC RIVER
Built 1959
ST 8 STATE ST over COMB HOOSIC RIV & PARR
Built 1941
HWY HRTG PRK DR over WATER HOOSIC RIVER
Built 1987
ST 2 W MAIN ST over RR PARR
Built 1882
HWY BROWN ST over WATER HOOSIC RIVER
Built 1952
Bridge Details
- Structure #
- N140120AGDOTNBI
- Year Built
- 1956
- Reconstructed
- 1983
- Length
- 16.8 m (55.1 ft)
- Max Span
- 14 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,571
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,546,000
- Total Project Cost
- $2,320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.