HWY HOLDEN ST over WATER N BR HOOSIC RIVER

AT NBR HOOSIC RIVER · County 003, Massachusetts · Built 1976 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N1400901KMUNNBI
Year Built
1976
Length
21 m (68.9 ft)
Max Span
19.9 m
Width
16.4 m (53.8 ft)
Lanes
2
Daily Traffic
3,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$412,000
Total Project Cost
$619,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.