HWY GROVE ST over RR MBTA
1 M E OF PLYMPTON TL · County 023, Massachusetts · Built 1992 · 2 Lanes · 1,681 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.002644, -70.777653
This bridge is in worse condition than 62.8% of bridges in County 023. The average bridge in Massachusetts is 0 years old; this one is 34 years old.
Nearby Bridges
ST 27 PEMBROKE ST over RR MBTA
Built 1958
ST106 WAPPING RD over WATER JONES RIVER
Built 1971
HWY ELM ST over WATER JONES RIVER
Built 2014
ST 3 A/TREMONT ST over ST 3 PILGRIM HWY
Built 1996
HWY LANDING RD over WATER STONY BROOK
Built 1954
ST 3 A/MAIN ST over WATER JONES RIVER
Built 1895
ST 3 PILGRIM HWY over HWY LANDING RD
Built 1955
ST 3 PILGRIM HWY over WATER JONES RIVER
Built 1955
ST 3 PILGRIM HWY over RR MBTA
Built 1954
HWY ELM ST over ST 3 PILGRIM HWY
Built 1962
Bridge Details
- Structure #
- K010074BRDOT634
- Year Built
- 1992
- Length
- 16.8 m (55.1 ft)
- Max Span
- 14 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,681
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,369,000
- Total Project Cost
- $2,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.