US202 SB over RR GWRR

.1 M S BR # H-21-35 · County 013, Massachusetts · Built 2010 · 2 Lanes · 11,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H210385XRDOTNBI
Year Built
2010
Length
62.6 m (205.4 ft)
Max Span
23 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
11,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$622,000
Total Project Cost
$934,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.