ST141 APPLETON ST over WATER FIRST LEVEL CANAL
200 N OF BIGELOW ST · County 013, Massachusetts · Built 1919 · 2 Lanes · 9,698 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
42.203656, -72.607531
This bridge is in worse condition than 93% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 107 years old.
Nearby Bridges
ST141 APPLETON ST over WATER SECOND LEVEL CANAL
Built 1921
HWY CABOT ST over WATER FIRST LEVEL CANAL
Built 1924
HWY DWIGHT ST over WATER FIRST LEVEL CANAL
Built 1850
HWY CABOT ST over WATER SECOND LEVEL CANAL
Built 1850
HWY DWIGHT ST over WATER SECOND LEVEL CANAL
Built 1889
HWY SARGEANT ST over WATER FIRST LEVEL CANAL
Built 1909
HWY LYMAN ST over WATER FIRST LEVEL CANAL
Built 2022
HWY SARGEANT ST over WATER SECOND LEVEL CANAL
Built 1850
HWY LYMAN ST over WATER SECOND LEVEL CANAL
Built 2010
ST116 /ST141/CABOT over WATER THIRD LEVEL CANAL
Built 1894
Bridge Details
- Structure #
- H21020131DOTNBI
- Year Built
- 1919
- Length
- 36.6 m (120.1 ft)
- Max Span
- 17.8 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,698
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,486,000
- Total Project Cost
- $11,230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.