HWY DWIGHT ST over WATER SECOND LEVEL CANAL
JUST SE OF 1ST CANAL · County 013, Massachusetts · Built 1889 · 2 Lanes · 4,762 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.205089, -72.603908
This bridge is in worse condition than 6.5% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 137 years old.
Nearby Bridges
HWY DWIGHT ST over WATER FIRST LEVEL CANAL
Built 1850
ST141 APPLETON ST over WATER SECOND LEVEL CANAL
Built 1921
HWY LYMAN ST over WATER SECOND LEVEL CANAL
Built 2010
ST141 APPLETON ST over WATER FIRST LEVEL CANAL
Built 1919
HWY LYMAN ST over WATER FIRST LEVEL CANAL
Built 2022
HWY CABOT ST over WATER SECOND LEVEL CANAL
Built 1850
HWY CABOT ST over WATER FIRST LEVEL CANAL
Built 1924
ST116 N BRIDGE ST over WATER SECOND LEVEL CANAL
Built 1990
ST116 /ST141/CABOT over WATER THIRD LEVEL CANAL
Built 1894
HWY SARGEANT ST over WATER SECOND LEVEL CANAL
Built 1850
Bridge Details
- Structure #
- H210150M1MUNNBI
- Year Built
- 1889
- Reconstructed
- 1990
- Length
- 38.8 m (127.3 ft)
- Max Span
- 37.8 m
- Width
- 16.1 m (52.8 ft)
- Lanes
- 2
- Daily Traffic
- 4,762
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $730,000
- Total Project Cost
- $1,096,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.