HWY CABOT ST over WATER FIRST LEVEL CANAL

.5 MI NW OF 3RD CANAL · County 013, Massachusetts · Built 1924 · 2 Lanes · 15,129 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H210210LWMUNNBI
Year Built
1924
Reconstructed
1988
Length
34 m (111.5 ft)
Max Span
13.1 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
15,129
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$655,000
Total Project Cost
$983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.