HWY SARGEANT ST over WATER FIRST LEVEL CANAL

.4 MI NW OF 3RD CANAL · County 013, Massachusetts · Built 1909 · 2 Lanes · 6,724 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H210220LYMUNNBI
Year Built
1909
Reconstructed
1997
Length
23.2 m (76.1 ft)
Max Span
22.8 m
Width
17.2 m (56.4 ft)
Lanes
2
Daily Traffic
6,724
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$449,000
Total Project Cost
$674,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.