I 391 & RAMPS ABCD over COMB MAIN ST & PVRR

.1 M N JCT CONN RIVER · County 013, Massachusetts · Built 1980 · 6 Lanes · 35,415 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
H210600WTDOTNBI
Year Built
1980
Length
780.1 m (2559.4 ft)
Max Span
41.1 m
Width
33.9 m (111.2 ft)
Lanes
6
Daily Traffic
35,415
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$172,034,000
Total Project Cost
$258,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.