HWY MAIN ST over WATER THIRD LEVEL CANAL

N OF SOUTH ST. · County 013, Massachusetts · Built 1978 · 4 Lanes · 26,121 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H21010132DOTNBI
Year Built
1978
Length
37.8 m (124 ft)
Max Span
36.9 m
Width
20.6 m (67.6 ft)
Lanes
4
Daily Traffic
26,121
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,553,000
Total Project Cost
$5,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.