HWY LYMAN ST over WATER SECOND LEVEL CANAL

AT JCT RACE ST. · County 013, Massachusetts · Built 2010 · 2 Lanes · 3,724 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H210168M3DOTNBI
Year Built
2010
Length
44.9 m (147.3 ft)
Max Span
21.7 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
3,724
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,753,000
Total Project Cost
$2,630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.