HWY LYMAN ST over WATER SECOND LEVEL CANAL
AT JCT RACE ST. · County 013, Massachusetts · Built 2010 · 2 Lanes · 3,724 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.207219, -72.601539
This bridge is in worse condition than 6.5% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 16 years old.
Nearby Bridges
HWY LYMAN ST over WATER FIRST LEVEL CANAL
Built 2022
HWY DWIGHT ST over WATER SECOND LEVEL CANAL
Built 1889
HWY DWIGHT ST over WATER FIRST LEVEL CANAL
Built 1850
ST116 N BRIDGE ST over WATER SECOND LEVEL CANAL
Built 1990
ST141 APPLETON ST over WATER SECOND LEVEL CANAL
Built 1921
ST141 APPLETON ST over WATER FIRST LEVEL CANAL
Built 1919
ST116 BRIDGE ST over COMB CONN RIVER & PVRR
Built 1990
HWY CABOT ST over WATER SECOND LEVEL CANAL
Built 1850
HWY CABOT ST over WATER FIRST LEVEL CANAL
Built 1924
US202 NB/BEECH ST over RR GWRR
Built 2013
Bridge Details
- Structure #
- H210168M3DOTNBI
- Year Built
- 2010
- Length
- 44.9 m (147.3 ft)
- Max Span
- 21.7 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,724
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,753,000
- Total Project Cost
- $2,630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.