ST116 N BRIDGE ST over WATER SECOND LEVEL CANAL
.1 M S CONN RIVER · County 013, Massachusetts · Built 1990 · 2 Lanes · 6,724 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.208833, -72.596975
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 36 years old.
Nearby Bridges
ST116 BRIDGE ST over COMB CONN RIVER & PVRR
Built 1990
HWY LYMAN ST over WATER SECOND LEVEL CANAL
Built 2010
HWY LYMAN ST over WATER FIRST LEVEL CANAL
Built 2022
HWY DWIGHT ST over WATER SECOND LEVEL CANAL
Built 1889
HWY DWIGHT ST over WATER FIRST LEVEL CANAL
Built 1850
ST141 APPLETON ST over WATER SECOND LEVEL CANAL
Built 1921
ST141 APPLETON ST over WATER FIRST LEVEL CANAL
Built 1919
US202 NB/BEECH ST over RR GWRR
Built 2013
US202 over WATER CONNECTICUT RIVER
Built 1958
US202 PRPLE HRT DR over HWY CANAL ST
Built 1958
Bridge Details
- Structure #
- H210170VGDOTNBI
- Year Built
- 1990
- Length
- 50.3 m (165 ft)
- Max Span
- 24.6 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,724
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,226,000
- Total Project Cost
- $1,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.