ST116 N BRIDGE ST over WATER SECOND LEVEL CANAL

.1 M S CONN RIVER · County 013, Massachusetts · Built 1990 · 2 Lanes · 6,724 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
H210170VGDOTNBI
Year Built
1990
Length
50.3 m (165 ft)
Max Span
24.6 m
Width
18.5 m (60.7 ft)
Lanes
2
Daily Traffic
6,724
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,226,000
Total Project Cost
$1,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.