US202 NB/BEECH ST over RR GWRR

JCT LYMAN ST. · County 013, Massachusetts · Built 2013 · 2 Lanes · 27,284 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
H21039BBMDOTNBI
Year Built
2013
Length
46.2 m (151.6 ft)
Max Span
18.4 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
27,284
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$486,000
Total Project Cost
$730,000